Most of last week was not a good week, apart from Sunday. It was very stressful, apart from Sunday, and I did more comfort reading than anything else. So there has been minimal progress on most items.
On a positive note, the Panda Hat for eldest niece is finished. I did the last of the sewing up and finishing off yesterday evening. It will definitely fit her, because it fits me :-) It is her birthday tomorrow and I do hope she likes it.
Baby Express suffered this week. I couldn't cope with the idea of back stitching, so those three green bars on the right are the sum total of progress on this piece since you last saw it.
Hermione's Socks also saw limited progress. I also learned that watching the TV and knitting a new to you pattern do not mix. There would be more to see if I hadn't had to tink back 5 needles following two episodes of "Great British Sewing Bee".
The cabled handwarmers got no love at all this week - hence no photo.
But then came Sunday, which was Christmas, or at least the workshop that I got given for Christmas! The strange yellowy thing is a toe-up sock or at least all the components of a toe-up sock. I spent most of Sunday learning new techniques in very pleasant company, and now in theory I have all the skills I need to knit toe-up socks as well as cuff-down socks. I just need to finish Hermione's Socks first.
In other news, I maintained at Slimming World this week so still 11 stone 8lb. And today I went out and bought a new monitor for my PC as the old one kept dying on me (another reason I didn't post yesterday - I didn't want the monitor to die mid-post). This is a 19.5 inch monitor (the smallest they had) - my old one was a 15 inch monitor - I don't have a lot of space. The only drawback is that it has no built-in speakers (which the old one did), so I will have to do something to remedy that.
Hopefully this week will be a better week. Wishing all the best to you and yours, and may the frog stay away from your needles.
Witterings about life in general, and knitting and cross stitch in particular.
Showing posts with label Panda Hat. Show all posts
Showing posts with label Panda Hat. Show all posts
Monday, 9 March 2015
Sunday, 1 March 2015
Preparing to March Forward
So February is over. I'm reasonably glad to see the back of it - it was far too cold and damp for my liking. However there have been some signs of Spring - crocuses and snowdrops in the gardens - daffodils in the shops. So now I'm looking forward to March.
Progress has been varied this last week, so I'll start with the most progress and work down to the least.
Beginning with the Panda Hat, the basic hat itself is finished - it just needs the back seam sewing up and blocking. The two black pieces are its ears, which need blocking, oversewing round the edges and attaching to the hat. Still to do are the two eyes, which will also need blocking and attaching to the hat before I embroider the pupils on. However I do have another week in which to get this done, so fingers crossed.
Moving on to Baby Express, I have completed the stitching on the second carriage and started the back stitching. I am unsure whether the black and white creature is a zebra or a cow - what are your thoughts? The next stage is to finish the back stitch on this section and then stitch the right hand border.
I did manage to get one more cable repeat knitted on my handwarmers, but at the moment it looks like they won't be completed before the weather changes for the better. However, if I can get at least one repeat done a week, they will eventually reach the finishing line.
And finally a new start! My fingers were getting all twitchy because I had no socks on the go. So, having finally managed to ball up the yarn I wanted to use, today I cast on for "Hermione's Everyday Socks" by Erica Lueder. The yarn is "Clovelly" in The Natural Dye Studio's Godiva HT 4 Ply/Sock (100% single spun merino). It feels absolutely lovely!
In other news, I had a day off on Friday to have my new toilet fitted. The porcelain on the old one was disintegrating and my plumber said that he had never seen anything like that before. The replacement only took about 3 hours and I had the rest of the day to myself. The only drawback was that the car had had to go into the garage to have a flashing dashboard light investigated (no definite conclusion reached - just have to wait and see what happens), so I just pottered about at home, knitting and stitching. At least I didn't have to go to work :-)
I didn't get weighed on Thursday, partly due to the car issue and partly because I had to go to a meeting that evening, so I don't know whether I made any progress in that area or not.
I have a busy week ahead of me, so will finish now and wish you and yours all the best and may the frog steer well clear of your needles.
Progress has been varied this last week, so I'll start with the most progress and work down to the least.
Beginning with the Panda Hat, the basic hat itself is finished - it just needs the back seam sewing up and blocking. The two black pieces are its ears, which need blocking, oversewing round the edges and attaching to the hat. Still to do are the two eyes, which will also need blocking and attaching to the hat before I embroider the pupils on. However I do have another week in which to get this done, so fingers crossed.
Moving on to Baby Express, I have completed the stitching on the second carriage and started the back stitching. I am unsure whether the black and white creature is a zebra or a cow - what are your thoughts? The next stage is to finish the back stitch on this section and then stitch the right hand border.
I did manage to get one more cable repeat knitted on my handwarmers, but at the moment it looks like they won't be completed before the weather changes for the better. However, if I can get at least one repeat done a week, they will eventually reach the finishing line.
And finally a new start! My fingers were getting all twitchy because I had no socks on the go. So, having finally managed to ball up the yarn I wanted to use, today I cast on for "Hermione's Everyday Socks" by Erica Lueder. The yarn is "Clovelly" in The Natural Dye Studio's Godiva HT 4 Ply/Sock (100% single spun merino). It feels absolutely lovely!
In other news, I had a day off on Friday to have my new toilet fitted. The porcelain on the old one was disintegrating and my plumber said that he had never seen anything like that before. The replacement only took about 3 hours and I had the rest of the day to myself. The only drawback was that the car had had to go into the garage to have a flashing dashboard light investigated (no definite conclusion reached - just have to wait and see what happens), so I just pottered about at home, knitting and stitching. At least I didn't have to go to work :-)
I didn't get weighed on Thursday, partly due to the car issue and partly because I had to go to a meeting that evening, so I don't know whether I made any progress in that area or not.
I have a busy week ahead of me, so will finish now and wish you and yours all the best and may the frog steer well clear of your needles.
Monday, 23 February 2015
First Knitting Goal of 2015
Dear Readers, this is going to be short and sweet. I'm cold, I'm tired and I'm not feeling brilliant physically or mentally. I'm going to write this post, sort out tomorrow's lunch, make a hot water bottle and go to bed.
As per the title of this post, this week I achieved the first of my knitting goals for the year. The first bootie was knitted last Monday, the day my cousin's baby was born, the second bootie and the first mitten on the Tuesday, and the second mitten on the Wednesday, when I steam blocked the set. I sewed them up Thursday and Friday, and popped them in the post on Saturday morning. The only remaining question is how long they are likely to fit a 10lb 1oz baby boy!
The focus on baby knits meant that progress was limited on Baby Express. There is still a long way to go before I can tick this goal off, but at least when it's finished, it can go straight off to its new owner, who will probably have grown out of his booties by then.
Last but not least for this week is the Panda Hat. A lot of work went into this once the baby knits were done. Basically, once my new needles came, I ripped out everything I had already done and cast on again for the larger size hat. I re-knitted everything that you saw in my last post and an extra five rows of the white. That leaves me with eight rows of white stocking stitch before I start the decreases.
In other news, I put on a further 0.5lb last week, bringing me up to 11 stone 8lb. However I know what caused it so am not too fussed.
Right, I think that's everything for the time being, so I am going to call it a day. All the best to you and yours, and may the frog stay away from your needles.
As per the title of this post, this week I achieved the first of my knitting goals for the year. The first bootie was knitted last Monday, the day my cousin's baby was born, the second bootie and the first mitten on the Tuesday, and the second mitten on the Wednesday, when I steam blocked the set. I sewed them up Thursday and Friday, and popped them in the post on Saturday morning. The only remaining question is how long they are likely to fit a 10lb 1oz baby boy!
The focus on baby knits meant that progress was limited on Baby Express. There is still a long way to go before I can tick this goal off, but at least when it's finished, it can go straight off to its new owner, who will probably have grown out of his booties by then.
Last but not least for this week is the Panda Hat. A lot of work went into this once the baby knits were done. Basically, once my new needles came, I ripped out everything I had already done and cast on again for the larger size hat. I re-knitted everything that you saw in my last post and an extra five rows of the white. That leaves me with eight rows of white stocking stitch before I start the decreases.
In other news, I put on a further 0.5lb last week, bringing me up to 11 stone 8lb. However I know what caused it so am not too fussed.
Right, I think that's everything for the time being, so I am going to call it a day. All the best to you and yours, and may the frog stay away from your needles.
Labels:
Baby Express,
Baby Knits,
Finish,
Goals,
Health,
Panda Hat
Monday, 16 February 2015
Happy Whatever It Is Day to you!
Saturday was Valentine's Day, Sunday was my parents' wedding anniversary and today is the day my cousin gave birth to a little boy! So I'm wishing you a very Happy Day on whatever day you are reading this.
So WIP pictures - some with more progress, some with less.
This is a brand new start. Mum rang me just before lunch to tell me that our new baby had arrived. So as soon as I got home, I cast on and had bootie No. 1 finished by 7pm, just in time for tea. The plan is to mail out two booties and two mittens on Saturday. Last week was a busy week, but this week should be a quiet week. Should be possible, fingers crossed.
As last week was a busy week, I didn't get as much done on Baby Express as I would have liked, but now that its owner has finally arrived, I will be cracking on with this as soon as his knits are finished. I can say that the far right hand side is in fact the inside of the border round the edge of this piece. So at least now I know how much space I have to play with on this side.
Again, not as much progress as I would have liked, but I am now into the cable section of this second hand warmer. This will have to go on hold this week in order to knit baby things, but I don't see an end to the wintry weather just yet so I still might get some use out of them before the warm weather turns up.
Finally, another new start, which I began at Knit Group on Saturday! However this will have to be ripped out and restarted. Firstly the little girl whose head this Panda Hat is meant to fit turns out to have a bigger head than anticipated. Secondly, I hate the needles with a passion. I bought them at the same time as I bought the yarn for this hat because I didn't have the right size, but they are plastic (all there was) and I am having to fight them for every stitch. So I have ordered some KnitPro Nova straights and will frog this piece and start again as soon as they arrive.
In other news, I have put on 0.5lb this week, but to be honest, I'm not that bothered. The weather is so cold, damp and dreary that there has been a smidgen too much chocolate in my diet this last week. Never mind, maybe the sun will come back out soon.
Wishing you and yours all the very best, and may the frog stay away from your needles.
So WIP pictures - some with more progress, some with less.
This is a brand new start. Mum rang me just before lunch to tell me that our new baby had arrived. So as soon as I got home, I cast on and had bootie No. 1 finished by 7pm, just in time for tea. The plan is to mail out two booties and two mittens on Saturday. Last week was a busy week, but this week should be a quiet week. Should be possible, fingers crossed.
As last week was a busy week, I didn't get as much done on Baby Express as I would have liked, but now that its owner has finally arrived, I will be cracking on with this as soon as his knits are finished. I can say that the far right hand side is in fact the inside of the border round the edge of this piece. So at least now I know how much space I have to play with on this side.
Again, not as much progress as I would have liked, but I am now into the cable section of this second hand warmer. This will have to go on hold this week in order to knit baby things, but I don't see an end to the wintry weather just yet so I still might get some use out of them before the warm weather turns up.
Finally, another new start, which I began at Knit Group on Saturday! However this will have to be ripped out and restarted. Firstly the little girl whose head this Panda Hat is meant to fit turns out to have a bigger head than anticipated. Secondly, I hate the needles with a passion. I bought them at the same time as I bought the yarn for this hat because I didn't have the right size, but they are plastic (all there was) and I am having to fight them for every stitch. So I have ordered some KnitPro Nova straights and will frog this piece and start again as soon as they arrive.
In other news, I have put on 0.5lb this week, but to be honest, I'm not that bothered. The weather is so cold, damp and dreary that there has been a smidgen too much chocolate in my diet this last week. Never mind, maybe the sun will come back out soon.
Wishing you and yours all the very best, and may the frog stay away from your needles.
Subscribe to:
Posts (Atom)
%2B-%2B08%2BMar%2B2015.jpg)













